CEERE Home RERL Home

Snapshots of WF-1 decommissioning

Preparing WF1 to be lowered

Preparing WF-1 to be lowered

Tony Ellis and a helper prepare to lower WF-1

Lowering the WF-1

Lowering the WF-1

WF-1 comes to rest on scaffolding

The WF-1 resting on the scaffolding

After the blades have been removed

Tony Ellis and Utama Abdulwahid removing the nacelle

The WF-1, without its nacelle, being hoisted onto the truck

The WF-1 ready for transport

Jim Manwell pointing out some of the features of the WF-1 to curious onlookers

Years of weathering took their toll on the blades

 
UMass Home Engineering Home